LIFT intersects 22 m at 1.05% Li2O at its Fi Southwest pegmatite, Yellowknife Lithium Project, NWT

Yellowknife Lithium Project
Figure 1 LIFT intersects 22 m at 1.05% Li2O at its Fi Southwest pegmatite, Yellowknife Lithium Project, NWT
Location of LIFT’s Yellowknife Lithium Project. Drilling has been thus far focused on the Near Field Group of pegmatites which are located to the east of the city of Yellowknife along a government-maintained paved highway, as well as the Echo target in the Further Afield Group.
Figure 2 LIFT intersects 22 m at 1.05% Li2O at its Fi Southwest pegmatite, Yellowknife Lithium Project, NWT
Plan view showing the surface expression of the Fi Southwest pegmatite with diamond drill holes reported in this press release.
Figure 3 LIFT intersects 22 m at 1.05% Li2O at its Fi Southwest pegmatite, Yellowknife Lithium Project, NWT
Cross-section illustrating YLP-0199 with results as shown in the Fi Southwest pegmatite dyke with a 22 m interval of 1.05% Li2O.
Figure 4 LIFT intersects 22 m at 1.05% Li2O at its Fi Southwest pegmatite, Yellowknife Lithium Project, NWT
Plan view showing the surface expression of the Nite pegmatite with diamond drill holes reported in this press release.
Figure 5 LIFT intersects 22 m at 1.05% Li2O at its Fi Southwest pegmatite, Yellowknife Lithium Project, NWT
Cross-section of YLP-0195 which intersected the Nite pegmatite dyke with a 15 m interval of 1.00% Li2O.
Figure 6 LIFT intersects 22 m at 1.05% Li2O at its Fi Southwest pegmatite, Yellowknife Lithium Project, NWT
Plan view showing the surface expression of the BIG West pegmatite with diamond drill holes reported in this press release.
Figure 7 LIFT intersects 22 m at 1.05% Li2O at its Fi Southwest pegmatite, Yellowknife Lithium Project, NWT
Cross-section of YLP-0191 which intersected the BIG West pegmatite dyke with a 11 m interval of 0.74% Li2O.
Figure 8 LIFT intersects 22 m at 1.05% Li2O at its Fi Southwest pegmatite, Yellowknife Lithium Project, NWT
Plan view showing the surface expression of the Fi Boye pegmatite with diamond drill holes reported in this press release.

VANCOUVER, British Columbia, Feb. 27, 2024 — Li-FT Power Ltd. (“LIFT” or the “Company”) (TSXV:LIFT) (OTCQX:LIFFF) (Frankfurt:WS0) is pleased to report assays from 8 drill holes completed at the Fi Southwest, BIG West, Nite, & Fi Boye pegmatites within the Yellowknife Lithium Project (“YLP”) located outside the city of Yellowknife, Northwest Territories (Figure 1). Drilling intersected significant intervals of spodumene mineralization, with the following highlights:

Highlights:

  • YLP-0199: 22 m at 1.05% Li2O, (Fi Southwest)
    including: 9 m at 1.87% Li2O
  • YLP-0195: 15 m at 1.0% Li2O, (Nite)
    including: 2 m at 1.42% Li2O
    and including: 8 m at 1.26% Li2O
  • YLP-0189: 4 m at 1.11% Li2O, (Fi Boye)

Discussion of Results

This week’s drill results are from 1,325 m drilled across eight holes, including the first hole of the 2024 winter program at Fi Southwest as well as 2023 results from the Nite, BIG West, and Fi Boye pegmatites. A table of composite calculations, general comments related to this discussion, and a table of collar headers are provided towards the end of this section.

David Smithson, SVP, Geology of LIFT comments, “Results from the deep drilling at Nite this week continue to impress with hole 195 intercepting 15 m at 1.0% Li2O at 250 m from the surface. This is the second deep hole we have drilled on the Nite structure following on from 10 m at 1.4% Li2O drilled at the same level in 2023. The Fi Southwest dyke was similarly impressive this week returning 22 m at 1.0% Li2O near to the surface. Drilling to date on the Fi Southwest dyke has defined over 900 m of good shallow mineralization so we are very excited to test the rest of the structure to depth in the 2024 drill program currently underway in the field.”

Li-FT yellowknife pegmatites Jan 2024
Li-FT yellowknife pegmatites Jan 2024

Figure 1 – Location of LIFT’s Yellowknife Lithium Project. Drilling has been thus far focused on the Near Field Group of pegmatites which are located to the east of the city of Yellowknife along a government-maintained paved highway, as well as the Echo target in the Further Afield Group.

The Fi-SW dyke strikes over at least 1.1 km on surface with an average outcropping width of approximately 20 m. The dyke dips between 60°-80° to the east-southeast and trends towards the north-northeast. Drilling of Fi SW shows that it ranges from a single 20-40 m wide dyke to 2-3 dykes of similar cumulative width within a 50-70 m wide corridor.

YLP-0199 is the first hole drilled in the 2024 winter program and was collared to test the Fi SW pegmatite approximately 150 m from its northern mapped extent and 50 m beneath the surface. Drilling intersected 4 m and 15 m wide pegmatites separated by 3 m of country rock with assays returning a wall-to-wall composite of 1.05% Li2O over 22 m that includes 9 m of 1.87% Li2O (Table 1 & 2, Figures 2 & 3).

YK pegmatites NR 26 Fi-SW GT
Individual Drill plans YK pegmatites NR 26 Fi-SW GT

Figure 2 – Plan view showing the surface expression of the Fi Southwest pegmatite with diamond drill holes reported in this press release.

 

Yellowknife section Fi 199 NR 26
Yellowknife section Fi 199 NR 26

Figure 3 – Cross-section illustrating YLP-0199 with results as shown in the Fi Southwest pegmatite dyke with a 22 m interval of 1.05% Li2O.

Nite Pegmatite

The Nite pegmatite complex comprises a north-northeast trending corridor of parallel-trending dykes that is exposed for at least 1.4 km of strike length and dips approximately 50°-70° degrees to the east. The northern part of this complex consists of a main dyke flanked by one or more thinner dykes whereas the southern part comprises a fanning splay of 5-10 thinner dykes that is up to 200 m wide.

YLP-0192 explored the Nite pegmatite approximately 400 m from its northern end, 150 m beneath the surface, and 100 m downdip of previously released YLP-0152 (1.24% Li2O over 5 m). Drilling intersected five pegmatite dykes ranging from 1-7 m wide for cumulative pegmatite of 19 m over 45 m of core. The deepest of these three dykes returned 0.87% Li2O over 6 m that includes 2 m of 1.99% Li2O.

YLP-0195 was drilled on a section 300 m south of YLP-0192 to test the Nite pegmatite 700 m from its northern end, 250 m beneath the surface, and 200 m downdip of YLP-0138 (1.51% Li2O over 12 m). New drilling intersected a 17 m wide dyke flanked by several 1-8 m dykes for cumulative 28 m of pegmatite over 59 m of core. Sampling of the thick dyke returned an assay composite of 1.00% Li2O over 15 m that includes subintervals of 1.42% Li2O over 2 m and 1.26% Li2O over 8 m (Table 1 & 2, Figures 4 & 5).

YK pegmatites NR 26 Nite GT
Individual Drill plans YK pegmatites NR 26 Nite GT

Figure 4 – Plan view showing the surface expression of the Nite pegmatite with diamond drill holes reported in this press release.

Yellowknife sections Nite 195 NR 26 New
Yellowknife sections Nite 195 NR 26 New

Figure 5 – Cross-section of YLP-0195 which intersected the Nite pegmatite dyke with a 15 m interval of 1.00% Li2O.

BIG West Pegmatite

The BIG West pegmatite complex comprises a northeast-trending corridor of parallel-trending dykes that is exposed for at least 1.5 km along strike and is steeply west dipping to subvertical. The complex is bound by two relatively continuous dyke structures that are 50-100 m apart in the northern half of the corridor and 150 m apart in the south. These dykes are here referred to as the east- (EB) and west-bounding (WB) dykes. This week’s results are described from southern- to northern-most.

YLP-0180 tested the WB dyke approximately 450 m from its southern mapped extent and <25 m beneath the surface, as well as 50 m and 100 m up-dip of previously released holes (YLP-0160, 0164) that both returned negligible grades. Drilling intersected a single 11 m wide pegmatite dyke that returned an assay composite of 0.54% Li2O over 5 m, which includes 1 m of 1.60% Li2O.

YLP-0185 was collared just west of the EB dyke and 200 m from the northern mapped extent of the BIG West complex to target the WB dyke approximately 50 m beneath the surface and 100 m up-dip of YLP-0191 (see below). Drilling intersected a single one-metre-wide pegmatite dyke that returned negligible grade.

YLP-0191 was drilled on the same section as YLP-0185 but was collared just east of the EB dyke, so that it tested this dyke within 25-50 m of the surface and the WB dyke at 150 m depth. Drilling shows that these bounding dykes are separated by ~100 m of country rock, with the EB dyke comprising two 11-12 m dykes flanked by 2-3 m wide dykes for cumulative 28 m of pegmatite over 70 m of drill core whereas WB comprises a single 27 m wide dyke. Significant assays were returned only from the EB dyke and includes composites of 0.74% Li2O over 11 m (including 1.48% Li2O over 4 m) and 0.54% Li2O over 12 m (with 1.44% Li2O over 3 m).

YLP-0183 is the most northerly hole drilled on the BIG West complex in 2023, just ~150 m from its northern mapped extent and targeting the EB dyke within 25 m of the surface. Drilling intersected a 13 m wide dyke flanked by several 1-7 m wide dykes for 33 m of pegmatite over 69 m of drill core. Assays from the thick dyke returned a composite of 0.51% Li2O over 6 m that includes a 1 m interval of 1.16% Li2O whereas the flanking dykes returned negligible grade (Table 1 & 2, Figures 6 & 7).

Drill plans YK pegmatites NR 26 Big W G
Individual Drill plans YK pegmatites NR 26 Big W G

Figure 6 – Plan view showing the surface expression of the BIG West pegmatite with diamond drill holes reported in this press release.

Yellowknife sections Big W 191 NR 26
Yellowknife sections Big W 191 NR 26

Figure 7 – Cross-section of YLP-0191 which intersected the BIG West pegmatite dyke with a 11 m interval of 0.74% Li2O.

Fi Boye Pegmatite

The Fi Boye pegmatite comprises a corridor of mostly north-south striking, steeply east-dipping, dykes that run parallel to, and lie 500-700 m west of, the Fi Main complex. The Fi Boye corridor has at least 1.7 km of striking length, contains between 1-5 dykes, and ranges from approximately 10-200 m in width. The two holes reported below comprise all the drilling done on Fi Boye in 2023.

YLP-0189 was drilled to test the Fi Boye dyke approximately 200 m from its northern mapped extent and 50 m beneath the surface. Drilling intersected a 14 m wide dyke flanked by several 1-2 m wide dykes for cumulative pegmatite of 16 m over 31 m. The thick dyke returned an assay composite of 1.11% Li2O over 4 m (Table 1 & 2, Figure 8).

Individual Drill plans YK pegmatites NR 26 Fi GT
Individual Drill plans YK pegmatites NR 26 Fi GT

Figure 8 – Plan view showing the surface expression of the Fi Boye pegmatite with diamond drill holes reported in this press release.

Drilling Progress Update LIFT intersects 22 m at 1.05% Li2O at its Fi Southwest pegmatite, Yellowknife Lithium Project, NWT

The Company has concluded its 2023 drill program at the Yellowknife Lithium Project with 34,238 m completed. Currently, LIFT has reported results from 189 out of 198 diamond drill holes (33,309 m).

General Statements

Six of the eight holes described in this news release were drilled broadly perpendicular to the dyke orientation so that the true thickness of reported intercepts will range somewhere between 65-100% of the drilled widths. A collar header table is provided below.

Two of the three holes drilled at the north end of the BIG West complex (YLP-0185, 0191) were drilled broadly downdip because collar locations for drilling perpendicular to dyke orientation fall within Big Hill Lake. The true thickness of these downdip intercepts will range between 40-50% of the drilled widths.

Mineralogical characterization for the YLP pegmatites is in progress through hyperspectral core scanning and X-ray diffraction work. Visual core logging indicates that the predominant host mineral is spodumene.

QA LIFT intersects 22 m at 1.05% Li2O at its Fi Southwest pegmatite, Yellowknife Lithium Project, NWT

All drill core samples were collected under the supervision of LIFT employees and contractors. Drill core was transported from the drill platform to the core processing facility where it was logged, photographed, and split by diamond saw prior to being sampled. Samples were then bagged, and blanks and certified reference materials were inserted at regular intervals. Field duplicates consisting of quarter-cut core samples were also included in the sample runs. Groups of samples were placed in large bags, sealed with numbered tags to maintain a chain-of-custody, and transported from LIFT’s core logging facility to ALS Labs (“ALS”) laboratory in Yellowknife, Northwest Territories.

Sample preparation and analytical work for this drill program were carried out by ALS. Samples were prepared for analysis according to ALS method CRU31: individual samples were crushed to 70% passing through 2 mm (10 mesh) screen; a 1,000-gram sub-sample was riffle split (SPL-21) and then pulverized (PUL-32) such that 85% passed through 75-micron (200 mesh) screen. A 0.2-gram sub-sample of the pulverized material was then dissolved in a sodium peroxide solution and analysed for lithium according to ALS method ME-ICP82b. Another 0.2-gram sub-sample of the pulverized material was analysed for 53 elements according to ALS method ME-MS89L. All results passed the QA/QC screening at the lab, all inserted standards and blanks returned results that were within acceptable limits.

Qualified Person

The disclosure in this news release of scientific and technical information regarding LIFT’s mineral properties has been reviewed and approved by Ron Voordouw, Ph.D., P.Geo., Partner, Director Geoscience, Equity Exploration Consultants Ltd., and a Qualified Person as defined by National Instrument 43-101 Standards of Disclosure for Mineral Projects (NI 43-101) and member in good standing with the Northwest Territories and Nunavut Association of Professional Engineers and Geoscientists (NAPEG) (Geologist Registration number: L5245).

About LIFT

LIFT is a mineral exploration company engaged in the acquisition, exploration, and development of lithium pegmatite projects located in Canada. The Company’s flagship project is the Yellowknife Lithium Project located in Northwest Territories, Canada. LIFT also holds three early-stage exploration properties in Quebec, Canada with excellent potential for the discovery of buried lithium pegmatites, as well as the Cali Project in Northwest Territories within the Little Nahanni Pegmatite Group.

For further information, please contact:

Francis MacDonald
Chief Executive Officer
Tel: +1.604.609.6185
Email: [email protected]
Website: www.li-ft.com
Daniel Gordon
Investor Relations
Tel: +1.604.609.6185
Email: [email protected]

Cautionary Statement Regarding Forward-Looking Information

Certain statements included in this press release constitute forward-looking information or statements (collectively, “forward-looking statements”), including those identified by the expressions “anticipate”, “believe”, “plan”, “estimate”, “expect”, “intend”, “may”, “should” and similar expressions to the extent they relate to the Company or its management. The forward-looking statements are not historical facts but reflect current expectations regarding future results or events. This press release contains forward looking statements. These forward-looking statements and information reflect management’s current beliefs and are based on assumptions made by and information currently available to the company with respect to the matter described in this new release.

Forward-looking statements involve risks and uncertainties, which are based on current expectations as of the date of this release and subject to known and unknown risks and uncertainties that could cause actual results to differ materially from those expressed or implied by such statements. Additional information about these assumptions and risks and uncertainties is contained under “Risk Factors and Uncertainties” in the Company’s latest annual information form filed on March 30, 2023, which is available under the Company’s SEDAR+ profile at www.sedarplus.ca, and in other filings that the Company has made and may make with applicable securities authorities in the future. Forward-looking statements contained herein are made only as to the date of this press release and we undertake no obligation to update or revise any forward-looking statements whether as a result of new information, future events or otherwise, except as required by law. We caution investors not to place considerable reliance on the forward-looking statements contained in this press release.

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this news release.

Featured Image: Freepik @ juanroballo

Disclosure:

1) The author of the Article, or members of the author’s immediate household or family, do not own any securities of the companies set forth in this Article. The author determined which companies would be included in this article based on research and understanding of the sector.

2) The Article was issued on behalf of and sponsored by, Li-FT Power Ltd. Market Jar Media Inc. has or expects to receive from Li-FT Power Ltd.’s Digital Marketing Agency of Record (Native Ads Inc.) ninety-six thousand five hundred American dollars for 26 days (20 business days).

3) Statements and opinions expressed are the opinions of the author and not Market Jar Media Inc., its directors or officers. The author is wholly responsible for the validity of the statements. The author was not paid by Market Jar Media Inc. for this Article. Market Jar Media Inc. was not paid by the author to publish or syndicate this Article. Market Jar has not independently verified or otherwise investigated all such information. None of Market Jar or any of their respective affiliates, guarantee the accuracy or completeness of any such information. The information provided above is for informational purposes only and is not a recommendation to buy or sell any security. Market Jar Media Inc. requires contributing authors to disclose any shareholdings in, or economic relationships with, companies that they write about. Market Jar Media Inc. relies upon the authors to accurately provide this information and Market Jar Media Inc. has no means of verifying its accuracy.

4) The Article does not constitute investment advice. All investments carry risk and each reader is encouraged to consult with his or her individual financial professional. Any action a reader takes as a result of the information presented here is his or her own responsibility. By opening this page, each reader accepts and agrees to Market Jar Media Inc.’s terms of use and full legal disclaimer as set forth here. This Article is not a solicitation for investment. Market Jar Media Inc. does not render general or specific investment advice and the information on PressReach.com should not be considered a recommendation to buy or sell any security. Market Jar Media Inc. does not endorse or recommend the business, products, services or securities of any company mentioned on PressReach.com.

5) Market Jar Media Inc. and its respective directors, officers and employees hold no shares for any company mentioned in the Article.

6) This document contains forward-looking information and forward-looking statements, within the meaning of applicable Canadian securities legislation, (collectively, “forward-looking statements”), which reflect management’s expectations regarding Li-FT Power Ltd.’s future growth, future business plans and opportunities, expected activities, and other statements about future events, results or performance. Wherever possible, words such as “predicts”, “projects”, “targets”, “plans”, “expects”, “does not expect”, “budget”, “scheduled”, “estimates”, “forecasts”, “anticipate” or “does not anticipate”, “believe”, “intend” and similar expressions or statements that certain actions, events or results “may”, “could”, “would”, “might” or “will” be taken, occur or be achieved, or the negative or grammatical variation thereof or other variations thereof, or comparable terminology have been used to identify forward-looking statements. These forward-looking statements include, among other things, statements relating to: (a) revenue generating potential with respect to Li-FT Power Ltd.’s industry; (b) market opportunity; (c) Li-FT Power Ltd.’s business plans and strategies; (d) services that Li-FT Power Ltd. intends to offer; (e) Li-FT Power Ltd.’s milestone projections and targets; (f) Li-FT Power Ltd.’s expectations regarding receipt of approval for regulatory applications; (g) Li-FT Power Ltd.’s intentions to expand into other jurisdictions including the timeline expectations relating to those expansion plans; and (h) Li-FT Power Ltd.’s expectations with regarding its ability to deliver shareholder value. Forward-looking statements are not a guarantee of future performance and are based upon a number of estimates and assumptions of management in light of management’s experience and perception of trends, current conditions and expected developments, as well as other factors that management believes to be relevant and reasonable in the circumstances, as of the date of this document including, without limitation, assumptions about: (a) the ability to raise any necessary additional capital on reasonable terms to execute Li-FT Power Ltd.’s business plan; (b) that general business and economic conditions will not change in a material adverse manner; (c) Li-FT Power Ltd.’s ability to procure equipment and operating supplies in sufficient quantities and on a timely basis; (d) the accuracy of budgeted costs and expenditures; (e) Li-FT Power Ltd.’s ability to attract and retain skilled personnel; (f) political and regulatory stability; (g) the receipt of governmental, regulatory and third-party approvals, licenses and permits on favorable terms; (h) changes in applicable legislation; (i) stability in financial and capital markets; and (j) expectations regarding the level of disruption to as a result of CV-19. Such forward-looking information involves a variety of known and unknown risks, uncertainties and other factors which may cause the actual plans, intentions, activities, results, performance or achievements of Li-FT Power Ltd. to be materially different from any future plans, intentions, activities, results, performance or achievements expressed or implied by such forward-looking statements. Such risks include, without limitation: (a) Li-FT Power Ltd.’s operations could be adversely affected by possible future government legislation, policies and controls or by changes in applicable laws and regulations; (b) public health crises such as CV-19 may adversely impact Li-FT Power Ltd.’s business; (c) the volatility of global capital markets; (d) political instability and changes to the regulations governing Li-FT Power Ltd.’s business operations (e) Li-FT Power Ltd. may be unable to implement its growth strategy; and (f) increased competition.

Except as required by law, Li-FT Power Ltd. undertakes no obligation to update or revise any forward-looking statements, whether as a result of new information, future event or otherwise, after the date on which the statements are made or to reflect the occurrence of unanticipated events. Neither does Li-FT Power Ltd. nor any of its representatives make any representation or warranty, express or implied, as to the accuracy, sufficiency or completeness of the information in this document. Neither Li-FT Power Ltd. nor any of its representatives shall have any liability whatsoever, under contract, tort, trust or otherwise, to you or any person resulting from the use of the information in this document by you or any of your representatives or for omissions from the information in this document.

7) Any graphs, tables or other information demonstrating the historical performance or current or historical attributes of Li-FT Power Ltd. or any other entity contained in this document are intended only to illustrate historical performance or current or historical attributes of Li-FT Power Ltd. or such entities and are not necessarily indicative of future performance of Li-FT Power Ltd. or such entities.

8) Investing is risky. The information provided in this article should not be considered as a substitute for professional financial consultation. Users should be aware that investing in any form carries inherent risks, and as such, there is a possibility of losing some or all of their investment. The value of investments can fluctuate significantly within a short period, and investors must understand that past performance is not indicative of future results. Additionally, users should exercise caution as transactions involving investments may be irreversible, even in cases of fraud or accidental actions. It is crucial to acknowledge that rapidly evolving laws and technical issues can have adverse effects on the usability, transferability, exchangeability, and value of investments. Furthermore, users must be cognizant of potential security risks associated with their investment activities. Individuals are strongly encouraged to conduct thorough research, seek professional advice, and carefully evaluate their risk tolerance before engaging in any investment endeavors. Market Jar Media Inc. is neither an investment adviser nor a broker-dealer. The information presented on the website is provided for informative purposes only and is not to be treated as a recommendation to make any specific investment. No such information on PressReach.com constitutes advice or a recommendation.