TORONTO, Dec. 19, 2024 /CNW/ – Global Atomic Corporation (“Global Atomic” or the “Company”), (TSX: GLO) (OTCQX: GLATF) (FRANKFURT: G12) is pleased to announce that it has signed an offtake agreement with a strategic Europe-based nuclear power utility to supply 260,000 pounds U3O8 per year for three years beginning in 2026.
This is the fourth such agreement signed by Global Atomic. Based on the 2024 Feasibility Study, the Dasa Mine is expected to produce 68.1 million pounds of U3O8 over the operation’s current 23-year mine plan.
This latest contract is consistent with the Company’s marketing strategy – adding to a portfolio that underwrites profitability and bank finance, whilst providing exposure to strong future market fundamentals.
In addition, pursuant to a request for proposal (“RFP”) from a large American utility, the Company recently submitted an RFP for the supply of 700,000 pounds U3O8 over a five-year delivery period, starting in 2028.
With approximately 12.5% of currently defined uranium production contracted, Global has covered its project construction costs and maintains flexibility to enter into further off-take agreements against a backdrop of tightening U3O8 supply dynamics.
Global Atomic President and CEO, Stephen G. Roman stated, “Utilities continue to be active in the uranium market and securing supply in a dwindling uranium supply universe. This finalization of the European contract is a positive sign amid the geopolitical challenges in Niger and demonstrates the European utility’s confidence in our ability to finance and develop Dasa to begin yellowcake deliveries in 2026.“
About Global Atomic
Global Atomic Corporation (www.globalatomiccorp.com) is a publicly listed company that provides a unique combination of high-grade uranium mine development and cash-flowing zinc concentrate production.
The Company’s Uranium Division is currently developing the fully permitted, large, high grade Dasa Deposit, discovered in 2010 by Global Atomic geologists through grassroots field exploration. The “First Blast Ceremony” occurred on November 5, 2022, and commissioning of the processing plant is scheduled for Q1, 2026. Global Atomic has also identified 3 additional uranium deposits in Niger that will be advanced with further assessment work.
Global Atomic’s Base Metals Division holds a 49% interest in the Befesa Silvermet Turkey, S.L. (BST) Joint Venture, which operates a modern zinc recycling plant, located in Iskenderun, Türkiye. The plant recovers zinc from Electric Arc Furnace Dust (EAFD) to produce a high-grade zinc oxide concentrate which is sold to zinc smelters around the world. The Company’s joint venture partner, Befesa Zinc S.A.U. (Befesa) holds a 51% interest in and is the operator of the BST Joint Venture. Befesa is a market leader in EAFD recycling, with approximately 50% of the European EAFD market and facilities located throughout Europe, Asia and the United States of America.
CAUTIONARY NOTE REGARDING FORWARD-LOOKING STATEMENTS:
The information in this release may contain forward-looking information under applicable securities laws. Forward-looking information includes, but is not limited to, statements with respect to completion of any financings; Global Atomics’ development potential and timetable of its operations, development and exploration assets; Global Atomics’ ability to raise additional funds necessary; the future price of uranium; the estimation of mineral reserves and resources; conclusions of economic evaluation; the realization of mineral reserve estimates; the timing and amount of estimated future production, development and exploration; cost of future activities; capital and operating expenditures; success of exploration activities; mining or processing issues; currency exchange rates; government regulation of mining operations; and environmental and permitting risks. Generally, forward-looking statements can be identified by the use of forward-looking terminology such as “plans”, “is expected”, “estimates”, variations of such words and phrases or statements that certain actions, events or results “could”, “would”, “might”, “will be taken”, “will begin”, “will include”, “are expected”, “occur” or “be achieved”. All information contained in this news release, other than statements of current or historical fact, is forward-looking information. Statements of forward-looking information are subject to known and unknown risks, uncertainties and other factors that may cause the actual results, level of activity, performance or achievements of Global Atomic to be materially different from those expressed or implied by such forward-looking statements, including but not limited to those risks described in the annual information form of Global Atomic and in its public documents filed on SEDAR from time to time.
Forward-looking statements are based on the opinions and estimates of management at the date such statements are made. Although management of Global Atomic has attempted to identify important factors that could cause actual results to be materially different from those forward-looking statements, there may be other factors that cause results not to be as anticipated, estimated or intended. There can be no assurance that such statements will prove to be accurate, as actual results and future events could differ materially from those anticipated in such statements. Accordingly, readers should not place undue reliance upon forward-looking statements. Global Atomic does not undertake to update any forward-looking statements, except in accordance with applicable securities law. Readers should also review the risks and uncertainties sections of Global Atomics’ annual and interim MD&As.
The Toronto Stock Exchange has not reviewed and does not accept responsibility for the adequacy and accuracy of this news release.
SOURCE Global Atomic Corporation
Featured Image: Megapixl @ Alex1594929