Fission Metallurgical Hole Intersects 34.0m @ 19.12%, Confirming it as One of the Best Holes to Date at Triple R Deposit

Kodym 2 Fission Metallurgical Hole Intersects 34.0m @ 19.12%, Confirming it as One of the Best Holes to Date at Triple R Deposit

Strong results from all seven holes

KELOWNA, BCNov. 8, 2022 – FISSION URANIUM CORP. (“Fission” or “the Company“) is pleased to announce assay results from the summer 2021 “metallurgical & geotechnical testwork” drilling on the R840W zone at its’ PLS project, in the Athabasca Basin region of Saskatchewan, Canada (see News Release September 07, 2021).  Four metallurgical holes and three geotechnical holes were completed as part of the Phase 1 feasibility study field work. Assays confirm that all 7 holes intersected wide intervals of mineralization, with 6 holes returning strong, high-grade intervals. The drilling was part of the technical work required for the feasibility study, which Fission expects to complete by the end of 2022 to early 2023. Of particular note, hole PLS21-MET-004 (line 615W), intersected a continuous interval measuring 34.0m @ 19.12% U3O8, including 26.0m @ 24.59% U3O8. With a total composite grade x thickness value “GT” of 650.7, this positions it as one of the strongest holes drilled to date at the PLS project.

Ross McElroy, President and CEO for Fission, commented, “These assays are a reminder of the incredible strength of mineralization we have here at PLS – with numbers that place the Triple R in an elite group of deposits worldwide. We have now received all outstanding drill assay results from holes drilled as part of our feasibility study, which remains on track for completion at the end of 2022 to early 2023. Our team continues to work hard advancing the project and I’m very pleased with our continued progress and results.”  

Drilling Highlights
  • All outstanding drill assay results for feasibility study are complete
  • A total of 6 out of 7 holes intersected high-grade mineralization
  • Hole PLS21-MET-004 is one of the best holes ever drilled at the PLS project

PLS21-MET-004 (line 615W) Total composite GT value of 650.7

  • 34.0m continuous mineralization @ 19.12% U3O8 (between 98.5m to 132.5m), including
    • 26.0m @ 24.59% U3O(between 102.5m to 128.5m)

PLS21-MET-003 (line 675W)

  • 47.5m continuous mineralization @ 2.55% U3O8 (between 99.0m to 146.5m), including
    • 9.0m @ 11.77% U3O(between 131.0m to 140.0m)

PLS21-MET-002 (line 765W)

  • 65.5m continuous mineralization @ 1.21% U3O8 (between 106.0m to 171.5m), including
    • 4.0m @ 4.60% U3O(between 135.0m to 139.0m)
    • 4.5m @ 9.36% U3O(between 165.5m to 170.0m)
R840W Zone Metallurgical Holes

Four large diameter HQ holes were collared and drilled vertically spaced over 180m of strike length to collect representative mineralized rock samples to be used for metallurgical testwork. The testwork is to verify the process required to extract U3O8 efficiently and economically, and understand the grade variability and mineralogy impact on processing factors such as recovery of the R840W zone compared to the R780E zone.

R840W Geotechnical Testwork Holes

Three holes were collared as angle holes to collect rock samples to be used for geotechnical testwork. The testwork will verify the rock strength and ground conditions likely to be encountered, and provide data to be used in the design of ground support, tunnel and stope dimensions and mining sequencing.  Additionally, samples were collected from the crown pillar area to analyse overall mining stability at the overburden/bedrock interface, to optimize ore recovery while maintaining overall mine stability.

Table 1: R840W Zone – Composited Mineralized Intervals – Metallurgical Holes

freesnippingtool.com capture 20230124085728 Fission Metallurgical Hole Intersects 34.0m @ 19.12%, Confirming it as One of the Best Holes to Date at Triple R Deposit

Composite Parameters

1. Minimum Thickness: 0.50m

2. Grade Cut-Off: 0.05m U3O8 (wt%)

3. Maximum Internal Dilution: 2:00m

Table 2: R840W Zone –
Composited Mineralized Intervals – Geotechnical Testwork Holes

freesnippingtool.com capture 20230124085847 1 Fission Metallurgical Hole Intersects 34.0m @ 19.12%, Confirming it as One of the Best Holes to Date at Triple R Deposit

Composite Parameters

4. Minimum Thickness: 0.50m

5. Grade Cut-Off: 0.05m U3O8 (wt%)

6. Maximum Internal Dilution: 2:00m

Samples from the drill core are split in half sections on site. Where possible, samples are standardized at 0.5m down-hole intervals. One-half of the split sample is sent to SRC Geoanalytical Laboratories (an SCC ISO/IEC 17025: 2005 Accredited Facility) in Saskatoon, SK for analysis which includes U3O8 (wt %) and fire assay for gold, while the other half remains on site for reference. All analysis includes a 63 element ICP-OES analysis and boron.  All analysis includes a 63 element ICP-OES, uranium by fluorimetry and boron. All depths reported of core interval measurements including sample and interval widths are down-hole and are not always representative of true thickness.  The orientation of the mineralized intervals tend to follow that of lithologic contacts, and generally dip steeply to the south. Within the Triple R deposit, individual zone wireframe models constructed from assay data and used in the resource estimate indicate that all 5 zones have a complex geometry controlled by and parallel to steeply south-dipping lithological boundaries as well as a preferential sub-horizontal orientation.

PLS Mineralized Trend & Triple R Deposit Summary

Uranium mineralization of the Triple R deposit at PLS occurs within the Patterson Lake Conductive Corridor and has been traced by core drilling over ~3.18 km of east-west strike length in five separated mineralized “zones” which collectively make up the Triple R deposit. From west to east, these zones are: R1515W, R840W, R00E, R780E and R1620E. Through successful exploration programs completed to date, Triple R has evolved into a large, near surface, basement hosted, structurally controlled high-grade uranium deposit.  The discovery hole was announced on November 05, 2012 with drill hole PLS12-022, from what is now referred to as the R00E zone.

The R1515W, R840W and R00E zones make up the western region of the Triple R deposit and are located on land, where overburden thickness is generally between 55 m to 100 m.  R1515W is the western-most of the zones and is drill defined to ~90 m in strike-length, ~68 m across strike and ~220 m vertical and where mineralization remains open in several directions.  R840W is located ~515 m to the east along strike of R1515W and has a drill defined strike length of ~430 m.  R00E is located ~485 m to the east along strike of R840W and is drill defined to ~115 m in strike length.  The R780E zone and R1620E zones make up the eastern region of the Triple R deposit.  Both zones are located beneath Patterson Lake where water depth is generally less than six metres and overburden thickness is generally about 50 m.  R780E is located ~225 m to the east of R00E and has a drill defined strike length of ~945 m.  R1620E is located ~210 m along strike to the east of R780E, and is drill defined to ~185 m in strike length.

The Company completed and filed a prefeasibility “PFS” study on November 07, 2019 titled “Pre-Feasibility Study on the Patterson Lake South Property Using Underground Mining Methods, Northern Saskatchewan, Canada“.  The report summarizes the Pre-Feasibility Study (“UG PFS”), which outlines an underground-only mining scenario for PLS which to date has only considered the R00E and R780E zones.

Mineralization along the Patterson Lake Corridor trend remains prospective along strike in both the western and eastern directions. Basement rocks within the mineralized trend are identified primarily as mafic volcanic rocks with varying degrees of alteration.  Mineralization is both located within and associated with mafic volcanic intrusives with varying degrees of silicification, metasomatic mineral assemblages and hydrothermal graphite. The graphitic sequences are associated with the PL-3B basement Electro-Magnetic (EM) conductor.

Patterson Lake South Property

The 31,039 hectare PLS project is 100% owned and operated by Fission Uranium Corp. PLS is accessible by road with primary access from all-weather Highway 955, which runs north to the former Cluff Lake mine and passes the nearby Nexgen Arrow deposit located 3km to the east and UEX-Areva Shea Creek discoveries located 50km to the north.

The technical information in this news release has been prepared in accordance with the Canadian regulatory requirements set out in National Instrument 43-101 and reviewed on behalf of the company by Ross McElroy, P.Geol., President and CEO for Fission Uranium Corp., a qualified person.

About Fission Uranium Corp.

Fission Uranium Corp. is a Canadian based resource company specializing in the strategic exploration and development of the Patterson Lake South uranium property – host to the class-leading Triple R uranium deposit – and is headquartered in Kelowna, British Columbia.  Fission’s common shares are listed on the TSX Exchange under the symbol “FCU” and trade on the OTCQX marketplace in the U.S. under the symbol “FCUUF.”

ON BEHALF OF THE BOARD                                

“Ross McElroy”                                                        

____________________________                              

Ross McElroy, President and CEO

Cautionary Statement:

Certain information contained in this press release constitutes “forward-looking information”, within the meaning of Canadian legislation. Generally, these forward-looking statements can be identified by the use of forward-looking terminology such as “plans”, “expects” or “does not expect”, “is expected”, “budget”, “scheduled”, “estimates”, “forecasts”, “intends”, “anticipates” or “does not anticipate”, or “believes”, or variations of such words and phrases or state that certain actions, events or results “may”, “could”, “would”, “might” or “will be taken”, “occur”, “be achieved” or “has the potential to”. Forward looking statements contained in this press release may include statements which involve known and unknown risks and uncertainties which may not prove to be accurate. Actual results and outcomes may differ materially from what is expressed or forecasted in these forward-looking statements. Such statements are qualified in their entirety by the inherent risks and uncertainties surrounding future expectations. Among those factors which could cause actual results to differ materially are the following: risks related to the Offering, risks related to Fission’s limited business history, risks related to the nature of mineral exploration and development, discrepancies between actual and estimated mineral resources, risks related to uranium market price volatility, risks related to the market value of the common shares of Fission, risks related to market conditions, risks related to the novel coronavirus (COVID-19) pandemic, including disruptions to the Company’s business and operational plans, risks related to the global economic uncertainty as a result of the novel coronavirus (COVID-19) pandemic and other risk factors listed from time to time in our reports filed with Canadian securities regulators on SEDAR at www.sedar.com. The forward-looking statements included in this press release are made as of the date of this press release and the Company disclaims any intention or obligation to update or revise any forward-looking statements, whether as a result of new information, future events or otherwise, except as expressly required by applicable securities legislation.

SOURCE Fission Uranium Corp.

For further information: Investor Relations, TF: 877-868-8140, [email protected], www.fissionuranium.com

Featured Image MegaPixl @ Kodym

Disclaimer

1) The author of the Article, or members of the author’s immediate household or family, do not own any securities of the companies set forth in this Article. The author determined which companies would be included in this article based on research and understanding of the sector.

2) The Article was issued on behalf of and sponsored by, Fission Uranium Corp. Market Jar Media Inc. has or expects to receive from Fission Uranium Corp.’s Digital Marketing Agency of Record (Native Ads Inc) one thousand five hundred USD for this article.

3) Statements and opinions expressed are the opinions of the author and not Market Jar Media Inc., its directors or officers. The author is wholly responsible for the validity of the statements. The author was not paid by Market Jar Media Inc. for this Article. Market Jar Media Inc. was not paid by the author to publish or syndicate this Article. The information provided above is for informational purposes only and is not a recommendation to buy or sell any security. Market Jar Media Inc. requires contributing authors to disclose any shareholdings in, or economic relationships with, companies that they write about. Market Jar Media Inc. relies upon the authors to accurately provide this information and Market Jar Media Inc. has no means of verifying its accuracy.

4) The Article does not constitute investment advice. Each reader is encouraged to consult with his or her individual financial professional and any action a reader takes as a result of the information presented here is his or her own responsibility. By opening this page, each reader accepts and agrees to Market Jar Media Inc.’s terms of use and full legal disclaimer as set forth here. This Article is not a solicitation for investment. Market Jar Media Inc. does not render general or specific investment advice and the information on PressReach.com should not be considered a recommendation to buy or sell any security. Market Jar Media Inc. does not endorse or recommend the business, products, services or securities of any company mentioned on PressReach.com.

5) Market Jar Media Inc. and its respective directors, officers and employees hold no shares for any company mentioned in the Article.

6) This document contains forward-looking information and forward-looking statements, within the meaning of applicable Canadian securities legislation, (collectively, “forward-looking statements”), which reflect management’s expectations regarding Fission Uranium Corp.’s future growth, future business plans and opportunities, expected activities, and other statements about future events, results or performance. Wherever possible, words such as “predicts”, “projects”, “targets”, “plans”, “expects”, “does not expect”, “budget”, “scheduled”, “estimates”, “forecasts”, “anticipate” or “does not anticipate”, “believe”, “intend” and similar expressions or statements that certain actions, events or results “may”, “could”, “would”, “might” or “will” be taken, occur or be achieved, or the negative or grammatical variation thereof or other variations thereof, or comparable terminology have been used to identify forward-looking statements. These forward-looking statements include, among other things, statements relating to: (a) revenue generating potential with respect to Fission Uranium Corp.’s industry; (b) market opportunity; (c) Fission Uranium Corp.’s business plans and strategies; (d) services that Fission Uranium Corp. intends to offer; (e) The Oregon Groups milestone projections and targets; (f) Fission Uranium Corp.’s expectations regarding receipt of approval for regulatory applications; (g) Fission Uranium Corp.’s intentions to expand into other jurisdictions including the timeline expectations relating to those expansion plans; and (h) Fission Uranium Corp.’s expectations with regarding its ability to deliver shareholder value. Forward-looking statements are not a guarantee of future performance and are based upon a number of estimates and assumptions of management in light of management’s experience and perception of trends, current conditions and expected developments, as well as other factors that management believes to be relevant and reasonable in the circumstances, as of the date of this document including, without limitation, assumptions about: (a) the ability to raise any necessary additional capital on reasonable terms to execute Fission Uranium Corp.’s business plan; (b) that general business and economic conditions will not change in a material adverse manner; (c) Fission Uranium Corp.’s ability to procure equipment and operating supplies in sufficient quantities and on a timely basis; (d) Fission Uranium Corp.’s ability to enter into contractual arrangements with additional Pharmacies; (e) the accuracy of budgeted costs and expenditures; (f) Fission Uranium Corp.’s ability to attract and retain skilled personnel; (g) political and regulatory stability; (h) the receipt of governmental, regulatory and third-party approvals, licenses and permits on favorable terms; (i) changes in applicable legislation; (j) stability in financial and capital markets; and (k) expectations regarding the level of disruption to as a result of CV-19. Such forward-looking information involves a variety of known and unknown risks, uncertainties and other factors which may cause the actual plans, intentions, activities, results, performance or achievements of Fission Uranium Corp. to be materially different from any future plans, intentions, activities, results, performance or achievements expressed or implied by such forward-looking statements. Such risks include, without limitation: (a) Fission Uranium Corp.’s operations could be adversely affected by possible future government legislation, policies and controls or by changes in applicable laws and regulations; (b) public health crises such as CV-19 may adversely impact Fission Uranium Corp.’s business; (c) the volatility of global capital markets; (d) political instability and changes to the regulations governing Fission Uranium Corp.’s business operations (e) Fission Uranium Corp. may be unable to implement its growth strategy; and (f) increased competition.

Except as required by law, Fission Uranium Corp. undertakes no obligation to update or revise any forward-looking statements, whether as a result of new information, future event or otherwise, after the date on which the statements are made or to reflect the occurrence of unanticipated events. Neither does Fission Uranium Corp. nor any of its representatives make any representation or warranty, express or implied, as to the accuracy, sufficiency or completeness of the information in this document. Neither Fission Uranium Corp. nor any of its representatives shall have any liability whatsoever, under contract, tort, trust or otherwise, to you or any person resulting from the use of the information in this document by you or any of your representatives or for omissions from the information in this document.

7) Any graphs, tables or other information demonstrating the historical performance or current or historical attributes of Fission Uranium Corp. or any other entity contained in this document are intended only to illustrate historical performance or current or historical attributes of Fission Uranium Corp. or such entities and are not necessarily indicative of future performance of Fission Uranium Corp. or such entities.